Ful Elektro d.o.o.

FUL ELEKTRO D.O.O.

COMPANY FOR THE DESIGN AND CONSTRUCTION
OF POWER FACILITIES

Design and construction of power facilities, electrical installations, municipal infrastructure works, high-rise and low-rise construction.

20+ years with you
Ful Elektro excavator
Ful Elektro machinery
Ful Elektro backhoe loader
Ful Elektro construction machinery
20+
YEARS WITH YOU
400+
COMPLETED PROJECTS
100+
EMPLOYEES

About us

„Ful Elektro“ d.o.o. company was founded in 2008.

We have 54 full-time employees, including electrical engineers, civil engineers, construction workers, heavy machinery operators, electricians, drivers, and administrative staff.

We specialize in the design and construction of power lines ranging from 110 kV to 1 kV, along with associated substations. Our services also include electrical installations and other municipal infrastructure works (such as water supply and telecommunication installations) for connecting residential and commercial buildings. Additionally, we carry out construction projects in both high-rise and low-rise building sectors.

We are involved in the construction of wind farms, solar parks, and small hydroelectric plants, as well as the complete development of industrial halls.

As licensed contractors for EPS and EDS Serbia, we are engaged in the development of new and maintenance of existing power facilities. Our operations are carried out across the territory of the Republic of Serbia.

We own a fleet of machinery, including excavators, trenchers, dump trucks, crane trucks, mini loaders, asphalt cutting machines, concrete compaction equipment, and more, as well as a construction workforce consisting of our full-time employees. When necessary, we engage subcontractors to meet investor demands without delays, ensuring strong relationships and continued collaboration.

We have been active in this field for 14 years, maintaining long-term cooperation with a large number of repeat clients.

References

Selected projects

Reference

Banja Komerc Bekament d.o.o.

Electrical installations for low-current and power systems, including the construction of a 20/0.4 kV transformer substation for a Styrofoam production factory in Aranđelovac.

Reference

Primar Co d.o.o.

Construction and electrical installation works on power facilities, supply lines, distribution cabinets and associated infrastructure.

Reference

Primar Co d.o.o. / Clinical Centre Niš

Works on the construction of a 10/0.4 kV transformer substation for connection, supply lines, distribution cabinets and outdoor lighting for the Clinical Centre Niš.

Reference

Elektroizgradnja d.o.o.

Construction of the 110/35 kV transformer substation, civil and electrical installation works with a 450 m² facility and a 35 kV line for the Malibunar Wind Farm.

Reference

Kovački centar Valjevo

Transformer substation TS 35/10/0.4 kV, 1x4 MVA + 1x6.3 MVA + 1x1.25 MVA and TS 10/0.4 kV for the Nova Kovačnica 2 facility.

Reference

Commercial Development d.o.o.

Execution of works on a 10 kV line for connection to the electricity distribution network of Ada Mall shopping centre in Belgrade.

Reference

Agro Development d.o.o. / WEST 65

Construction of the TS 110/10 kV transformer substation for the Tower and shopping centre, and construction of a 10 kV line for connecting the WEST 65 facility.

Reference

Montprojekt d.o.o.

Execution of works on the complete outdoor lighting system for the FAS Kragujevac factory complex.

Reference

Municipality of Trgovište

Execution of power and infrastructure works for public facilities and municipal infrastructure.

Reference

Art X d.o.o. / Dobropoljska

Electrical installations and associated power works on the facility in Dobropoljska Street.

Reference

SIMS Novogradnja d.o.o. / Dobanovci

Power works, connections, supply installations and associated infrastructure for the facility in Dobanovci.

Reference

IT Tel Consulting & Engineering d.o.o.

Cooperation on power, installation and infrastructure works for designed facilities.

Reference

Energoprojekt Oprema a.d.

Electrical installation and power works within projects in the fields of energy, infrastructure and industrial facilities.

Reference

Kolektor Etra / Barajevo

Power, infrastructure and associated works for the facility and plant in Barajevo.

Contact

FUL ELEKTRO D.O.O.
+381 11 24 20 079
VAT: 105446260
ID Number: 20386355
Bank Account: 160-301148-90

Send message

Location