Skip to content

FUL ELEKTRO D.O.O.

COMPANY FOR DESIGN AND
CONSTRUCTION OF POWER FACILITIES

About usarrow_forward
20+
YEARS WITH YOU
400+
COMPLETED PROJECTS
100+
EMPLOYEES

About us

“Ful Elektro” d.o.o. company was founded in 2008.

We have 54 full-time employees, including electrical engineers, civil engineers, construction workers, heavy machinery operators, electricians, drivers, and administrative staff.

We specialize in the design and construction of power lines ranging from 110 kV to 1 kV, along with associated substations. Our services also include electrical installations and other municipal infrastructure works (such as water supply and telecommunication installations) for connecting residential and commercial buildings. Additionally, we carry out construction projects in both high-rise and low-rise building sectors.

We are involved in the construction of wind farms, solar parks, and small hydroelectric plants, as well as the complete development of industrial halls.

As licensed contractors for EPS and EDS Serbia, we are engaged in the development of new and maintenance of existing power facilities. Our operations are carried out across the territory of the Republic of Serbia.

We own a fleet of machinery, including excavators, trenchers, dump trucks, crane trucks, mini loaders, asphalt cutting machines, concrete compaction equipment, and more, as well as a construction workforce consisting of our full-time employees. When necessary, we engage subcontractors to meet investor demands without delays, ensuring strong relationships and continued collaboration.

We have been active in this field for 14 years, maintaining long-term cooperation with a large number of repeat clients.

REFERENCES

Banja Komerc Bekament d.o.o.

DESCRIPTION OF WORKS

Installation of low and high voltage electrical systems, including the construction of a 20/0.4 kV transformer station for a styrofoam production factory in Aranđelovac.

INVESTOR

REFERENCES

Primar Co d.o.o.

DESCRIPTION OF WORKS

Execution of works on the construction of a 10/0.4 kVA transformer station for connection, including the installation of power supply lines to distribution cabinets and the complete external lighting system for the Clinical Center Niš.

INVESTOR

REFERENCES

Elektroizgradnja d.o.o.

DESCRIPTION OF WORKS

Construction of a 110/35 kV substation, including civil and electromechanical works, with a 450 m² facility and a 35 kV power line at the Malibunar Wind Farm.

INVESTOR

REFERENCES

Kovački centar Valjevo

DESCRIPTION OF WORKS

Substation TS 35/10/0.4 kV, 1x4 MVA + 1×6.3 MVA + 1×1.25 MVA – "KOVAČKI CENTAR" and Substation TS 10/0.4 kV, 2×1.25 MVA – "NOVA KOVAČNICA 2"

INVESTOR

REFERENCES

Commercial Development d.o.o.

DESCRIPTION OF WORKS

Execution of works on the 10 kV power line for connection to the distribution network of the "Ada Mall" shopping center in Belgrade.

INVESTOR

REFERENCES

Primar Co d.o.o.

DESCRIPTION OF WORKS

Civil and electromechanical works, 10 kV power line for the Big Fashion Belgrade facility.

INVESTOR

REFERENCES

Agro Development d.o.o.

DESCRIPTION OF WORKS

Construction of 110/10 kV substation – TS1 for the Kula building, TS2 for the shopping center, and the installation of a 10 kV power line for the connection of the WEST 65 complex.

INVESTOR

REFERENCES

Montprojekt d.o.o.

DESCRIPTION OF WORKS

Execution of works on the complete external lighting system of the FAS Kragujevac factory complex.

INVESTOR

REFERENCES

Opština Trgovište

DESCRIPTION OF WORKS

Construction of 10 individual residential buildings, Type 60 and Type 80, on parcel KP-2799, Đerekarce cadastral area, Municipality of Trgovište.

INVESTOR

REFERENCES

ART-X d.o.o.

DESCRIPTION OF WORKS

Construction of a 1,500 m² residential and commercial building in Dobropoljska.

INVESTOR

REFERENCES

Sims Novogradnja d.o.o.

DESCRIPTION OF WORKS

Construction of two warehouse facilities with a total area of 5,000 m² in Dobanovci.

INVESTOR

REFERENCES

“IT TEL Consulting & Engineering” d.o.o.

DESCRIPTION OF WORKS

Civil and electromechanical works on the construction of a 10 kV power line at the IKEA construction site in Belgrade.

INVESTOR

REFERENCES

Energoprojekt Oprema a.d.

DESCRIPTION OF WORKS

Construction of TS1, TS2, and TS3 substations, including electrical installations for TS1, TS2, and TS3, power supply installations for lighting, fire protection, and water supply, as well as infrastructure for the Lagoon on the lower and upper platform, operational and crushing plateau, for the Vinča Landfill facility.

INVESTOR

REFERENCES

Kolektor Etra Barajevo

DESCRIPTION OF WORKS

Expansion of the transformer factory and construction of a testing station for transformers.

INVESTOR

Contact

FUL ELEKTRO D.O.O.
+381 11 24 20 079
VAT: 105446260
ID Number: 20386355
Bank Account: 160-301148-90





    Location

    Back To Top